Installation of Sea Water Intake System, Re-Installation of Emergency Shutdown Valves (ESDV) at the Turret-side of PFLNG Dua. Supply of the indirect and direct manpower, including all necessary tools.
Client
Japan Gas Corporation / PETRONAS Floating LNG 2 (L) Ltd.
Location
Samsung Heavy Industries Co. Ltd (SHI) Shipyard, Geoje, South Korea and Rotan Gas Field, Block H, Offshore Sabah, Malaysia.
Commencement Date
January 2020
Project Background
Established and managed a complete installation team for project execution.
Providing all technical deliverables required for the project (Job cards, work procedures, safety documents, etc.)