Provision of Engineering, Procurement, Construction, Installation & Commissioning (EPCIC) for PL431, PL436 & PL314 Pipeline Replacement & Topside Modification

Marine & Engineering Consultancy Services for Bokor Betty Brownfield Rejuvenation

Client

Petronas Carigali Sdn Bhd

Location

Baram Field, Offshore Sarawak – PL431 – completed Semarang Field, Offshore Sabah – PL314 – completed West Lutong Field, Offshore Sarawak – PL436 – in-progress

Commencement Date

April 2023 – Ongoing

Project Background

Scope of Work

  • Pipeline detailed engineering including I/Jtube and FLP ancillaries design (including installation engineering) and detailed engineering for topside modification work.
  • Procurement (including inspection, logistic, delivery and expediting services) of all PL431, PL436 & PL314 items, both of permanent or temporary nature.
  • Provision of all things required in order to complete onshore fabrication.
  • Transportation and Installation of I/JTube, clamps, flexible pipeline and related ancillaries, concrete mattress, and pre-commissioning
  • Installation of Spool, SDV, topside piping, etc.
  • Assist commissioning of PL431, PL46 & PL314 system.

Challenges

  • Offshore campaign for PL431 will be carried out during monsoon season.
  • Shallow water depth for PL314
  • H2S Field for PL436 and PL314

Project Galleries