Provision of EPCIC For FSO Duta Pacific At Banang Field
Provision of FSO Duta Pacific Detachment at Banang Field
Client
Petronas / Petra Energy / Duta Marine Sdn Bhd
Location
Banang Field, Offshore Terengganu
Commencement Date
August 2022 until December 2022
Project Background
Scope of Work
Provision of Detachment of FSO Duta Pacific
Provision of Hooking Up FSO Duta Pacific & Mooring Analysis
Provision of Procurement of the Mooring Accessories and Pressure & Leak Test of Buoy
Provision of Mobilization and Demobilization of Suitable Vessel(s)
Provision of Positioning & Site SurveyProvision of Disconnection and Reinstatement of 6” Manuli Hose
Deliverables
Project Management, Procurement, Onshore/Offshore Construction Team and all related engineering deliverables
Challenges
Urgency of the project, prompt planning with careful evaluation to ensure delivery of the project safely within budget and a specific timeframe
Offshore campaign for reinstatement was conducted during monsoon season.. Operating criteria have been developed which specify the length of the forecast period of stable weather prior to initiating the FSO mooring installation operation.